What it costs
What Lower Mainland installers publish on their own sites, before tax. Your quote depends on the size of the house and how much you want lit.
| How it's priced | Published price | What's included |
|---|---|---|
| Leased lights, packages (Delta and Vancouver) | From $995 a season plus GST; bigger packages from $1,995 | Design, lights, repairs within 48 hours, January takedown, storage |
| Leased lights, packages (Vancouver to the Fraser Valley) | From $790 for the roofline; $1,149 with the entry | Lights, repairs within 48 hours, January takedown; storage from $1,149 |
| Their lights, by the foot (Vancouver) | $8 a foot, $399 minimum | Lights, repairs all season, January takedown |
| Your lights, by the foot (same company) | $5 a foot | Hanging, repairs, January takedown |
| Leased lights, by the foot (Metro Vancouver, including Delta) | From $8.50 a foot | Lights, repairs, January takedown, storage |
| You buy the lights the first year (Delta) | Typically from $1,100 the first year, about half that after | Lights you keep, install and takedown |
| Trees and wreaths (Vancouver) | $85 a tree, $45 a wreath | On top of the roofline |
From each company's own website, checked November 16, 2026. A Metro Vancouver electrical contractor puts a basic install at $700 to $1,000 and a mid-sized home at $1,200 to $1,800.
Permanent lights are the other option: lights that stay on the roofline all year, so there's nothing to hang each fall. A Metro Vancouver electrical contractor puts them at about $3,000 to $6,000 or more up front. Electricians and outdoor lighting companies install them, and so does Delta Christmas Lighting.
Who owns the lights
This is the biggest difference between quotes.
- Leased
- The installer owns the lights, puts them up, takes them down and stores them. You pay each season and store nothing. Most packages work this way.
- You buy them
- You pay for the lights the first year, then only for putting them up and taking them down.
- Your own lights
- Some installers will hang lights you already have, for less.
When to book, and when they come down
Crews start in October, and November is the busiest month. Some installers put the lights up any day from October 1 and set a timer for the night you want them on, so an early install doesn't mean an early display.
Some say they're usually full by mid-November. Others can install within a week of a quote when they have room. Late in November, call two or three.
Most take the lights down in January. Delta Christmas Lighting says its crews come back in January and store the lights until next fall. Get the takedown window in writing.
What to ask before you book
A good written quote answers these.
- Who owns the lights, and who stores them until next year
- Whether they're commercial-grade lights
- Whether the January takedown is in the price, and when it happens
- How fast they come back if a run goes out, and whether that's free
- Which clips they use on shingles and gutters: no staples, nails or screws
- Proof of liability insurance and a WorkSafeBC clearance letter (a very low price can mean no coverage)
- Which outdoor outlets they'll use, and whether a timer is included
Local tip. BC Hydro says LED holiday lights use up to 90% less energy than the old incandescent kind and last up to 10 times longer. A timer keeps them off overnight.
Questions
How much does it cost to have Christmas lights put up?
Luxe Bros, which works in Delta, starts at $995 a season plus GST, with the lights, repairs, January takedown and storage included. By the foot, Lower Mainland installers publish about $5 to $10 with their lights, and less if they hang yours. A Metro Vancouver electrical contractor puts a basic install at $700 to $1,000 and a mid-sized home at $1,200 to $1,800.
Who puts up Christmas lights in Tsawwassen?
Three businesses in our directory list it: Delta Christmas Lighting, which does only lights, and two lawn companies, Jim's Mowing and Augusta Lawn Care of Delta. Two exterior-cleaning companies, Luxe Bros and Mean Clean, also name Tsawwassen or Delta on their sites.
Is it too late to book?
It depends on the installer. Some say they're usually full by mid-November; others can install within a week of a quote when they have room. Call two or three and ask for their next opening.
Why would they put them up in October?
Some installers start on October 1 to fit everyone in, and set a timer for the night you want them on. An October install doesn't have to mean an October display.
When do they come down?
Usually in January. Ask for the window in writing when you book. Most packages include storage until next fall, so there's nothing to keep in the garage.
Can they use lights I already own?
Some will, and it costs less: one Vancouver company charges $5 a foot with your lights and $8 with theirs. Mean Clean lets you use your own or buy theirs. Package installers usually hang only their own, so ask.
What if a strand goes out in December?
The packages we checked include a free fix, usually within 48 hours, all season. Ask what's included before you book.
What about permanent lights?
They stay on the roofline all year, so there's nothing to hang each fall. A Metro Vancouver electrical contractor puts them at about $3,000 to $6,000 or more up front. Electricians and outdoor lighting companies install them, and so does Delta Christmas Lighting.
Do LED lights cost much to run?
BC Hydro says LED holiday lights use up to 90% less energy than incandescent ones and last up to 10 times longer. Put them on a timer so they're off overnight.
I'm in a townhouse or strata. Can I hire someone?
Check your strata's rules on exterior decorations first. Delta Christmas Lighting lists condo and strata installs among its services.


